Senegal Oil & Gas Upstream Procurement (2026)
Sangomar 100k bpd, GTA LNG 10 Mtpa target, Yakaar-Teranga: how foreign upstream vendors win Senegal's E&P procurement pipeline through 2030.
Sangomar 100k bpd, GTA LNG 10 Mtpa target, Yakaar-Teranga: how foreign upstream vendors win Senegal's E&P procurement pipeline through 2030.
Ghana's $2 billion Jubilee well campaign and the Eban-Akoma tie-back drive subsea and mooring RFQs. Who buys the kit, and how foreign suppliers get paid.
Ghana runs 4,132 MW of capacity, a $533M transmission upgrade, and a 100,000 bpd refinery build. How energy suppliers win English-default RFQs.
Ghana targets 50% LPG access by 2030, lifting H1 2025 consumption to 168.6 million kg. What buyers of bottling lines and cylinder plants need to know.
Capital machinery clears Ghana customs at 5% duty, GIPC can zero-rate it, and the cedi is stable. How to land a crude distillation unit at Tema.
Ghana imports over 90% of its fuel, a $3.7bn bill through August 2025. That gap is the case for modular refinery skids. Who supplies them and who buys.
Ghana pigged the 678 km West African Gas Pipeline in 2025. Where to buy used and modular pigging and inline-inspection kit, and who issues the RFQs.
Compression lifts the Mnazi Bay to Dar pipeline from 784 to 1,002 mmscfd. A buyer-side guide to selling gas compressor stations into Tanzania.
EACOP pump stations hit 59-67% in April 2026. The import, FX, and TBS clearance mechanics for landing API 610 pumps in Tanzania.
Tanzania's $42B Lindi LNG sits behind a 2028 FID, but TPDC's Mini-LNG and CNG rollout is buying modular skids now. Where the near-term RFQs actually are.
EACOP's Chongoleani jetty hit 88.1% with all three loading arms installed. A buyer-side guide to sourcing marine loading arm equipment in Tanzania.
EACOP's Sojo yard coated 1,443 km of insulated 24-inch pipe. A buyer-side guide to FBE, 3LPE, and field-joint coating equipment for Tanzania.
EACOP at 82% and a $42B LNG project pull pipe, pumps, compressors, and loading arms into Tanzania. A buyer-side routing guide for equipment suppliers.
EACOP at 82% and $42B Tanzania LNG in legal review shape the midstream RFQ market. Where foreign vendors win pipe, pumps, and liquefaction packages.
Lobito 200k bpd, Cabinda 60k bpd, Soyo 100k bpd: how foreign refinery, LNG, and marine-terminal vendors actually win Angola's downstream RFQs.
EqG's contracting hydrocarbon economy, CEMAC EUR-peg LCs, methanol-to-refinery capex and Bata-Malabo port modernisation, mapped for foreign suppliers.
How foreign suppliers win procurement in Libya's oil and gas upstream sector. NOC capex sits at USD 3 to 4 billion short term and oil production targets 1.6 Mbpd.
South Sudan's oil-led procurement market: 157,000 bpd output, the Bashayer pipeline restart, and FX rules for foreign industrial suppliers.
Tilenga 190k bpd, Kingfisher 40k bpd, EACOP 1,443 km: how foreign upstream vendors win Uganda's Albertine Graben procurement pipeline through 2030.